ProProcess Engineering
2022
- Mass Balance and Costing of a Glycerol Purification and a Propylene Glycol commercial plant
METKA Engineering
2021
- Developed a Plant Performance Test Procedure for handover of the LPG Unloading & Storage Facility
- Developed a Calculation Model on the condensation rate of LPG gas in the spheres during LPG unloading from the ship
- Performed a study and provided recommendations on the environmental heating of the unloading pipeline
- Performed a study with recdommendations on the vaporisation of condensed LPG in the inlet piping to the Vapour Recovery Unit
- Evaluated the maximum allowable flow velocity of the LPG to the spheres during LPG unloading
METKA Engineering
2020
Consulted to Metka Engineering in Accra in Ghana in commissioning and optimisation of the LPG Unloading Facility as part of the Ghana Bridge Power Project.
- Ship LPG Unloading and Commissioning
- Flare Design for LPG release
- Calculation Model for Line-Blow of Unloading Pipeline
- Calculation Model for Heat Tracing of LPG Pipelines
Resonant Nuteq
2020
- Mass Balance on a proposed pilot plant for leaching and recovery of Manganese Sulphate
- Capital costing of Pilot Plant
- High Level Costing of Operating and Capital Cost for Commercial plant
Resonant Environmental Technologies
2020
- Multipole Projects developed and assemble and demonstrated a Continuous Positive Air Pressure (CPAP) system to assist breathing for patients with the Covid 19 disease. This project formed part of the National Ventilator Project.
Cross EPC
2020
- Multipole Projects contracted to Cross EPC in the commissioning of an LPG unloading and storage facility in Accra, Ghana. Commissioning included the Jetty Piping System where the marine loading arm is connected to the ship, the Booster Pump Station, the Inter-Tank Transfer Pump Station, and the LPG Rcovery Unit.
Multipole Projects
2020
- Developed electrocoagulation operating parameters for the recovery of Chromium from a Tanning Effluent Stream. The development work was performed in the Multipole Projects laboratory.
Safe Water Global (Pretoria)
2019
- Developed a Documentation and Quality Control System for the mixing and packaging of a water treatment powder for human consumption to obtain the SABS mark
Rheinmetall Denel Munition (RDM)
2019
- Synthesized Nitrotriazolone (NTO) on Laboratory scale with the emphasis on developing a continuous commercial Production Plant
Rheinmetall Denel Munition (RDM)
2019
- Compiled order of magnitude quotations, in the range of 60 to 100 million Rand for turnkey supply of chemical plant facilities in the explosives manufacturing industry
Rheinmetall Denel Munition (RDM)
2019
- Costing of Commercial Production Plant for Nitrocellulose and Ball Grain Propellant
Resonant
2019
- Designed, procured and built a Pilot Plant for the recovery of Zinc Oxide from stack dust
NECSA (Pretoria)
2018
- Investigated the performance of the Hydrofluoric Acid Plant at Pelchem (NECSA) and submitted a report indicating the shortfalls of the different unit operations together with a proposal for renovation, reinstatement and upgrading of the plant
SA Mint
2018
- Developed a calculation model for a electroplating bath cooling coil
- Costing for design, supply, installation and commissioning of measuring system for electroplating cooling circuit
Resonant for King Abdulaziz City for Science and Technology (KACST)
2018
- Co-designed, built and operated a Laboratory scale fractionating distillation column for the separation and purification of Unsymmetrical Dimethyl Hydrazine (UDMH)
Kriel Power Station
2017
- Detail design of a Water Supply System for a Lime Mixing Plant for Kriel Power Station
Resonant for JDLL Singapore
2017
- Detail design of a Fluidised Bed Reactor for the production of Tungsten Hexafluoride (WF6) on commercial scale
- Designed, built and operated a pilot Fluidised Bed Reactor for piloting the fluidisation characteristics of a (WF6) fluidised bed reactor by using simulation raw materials
University of Pretoria
2016
- Conceptual design and costing of a Zirconium Oxide Demonstration
Resonant for King Abdulaziz City for Science and Technology (KACST)
2016
- Detail designed, built and operated a Hydrazine Process Pilot Plant, producing 2% aqueous Hydrazine solution
Resonant for King Abdulaziz City for Science and Technology (KACST)
2015
- Basic Engineering and Detail Engineering for a Liquified Petroleum Gas (LPG), Ammonia and Sodium Hypochlorite storage and distribution facility
SASOL Nitro (Ekurhuleni)
2014
- Conceptual and Basic Engineering package (+/-20% cost estimate) for an effluent treatment plant (Pre-filtration, Reverse Osmosis, Ion Exchange).
- Mass Balance using the IDEAS Process Simulation Software (Andritz)
Sunrise Energy (Saldanha)
2014
- Study on the engineering, safety, operability and economic implications of a tie-in into an off-shore LPG unloading line for Sunrise Energy in Saldanha
Aveng Extractive Technologies (Woodmead)
2014
- Basic Engineering Package with a +/- 20% cost estimate for an Ultrafiltration & Reverse Osmosis Plant for the Areva uranium mine in Namibia. Selective separation of a process stream resulting in overall reduction in chemical consumption. Design of the plant is based on actual pilot plant data.
- Mass & Energy Balance using the IDEAS Process Simulation Software (Andritz)
Fluor SA (Woodmead)
2014
- Basic Engineering for the Natref Clean Fuels II Project (Petrochemical refinery in Sasolburg)
- Design Basis to Process Flow Diagram development to Mechanical Flow Diagram development to HAZOP documents preparation for a New Cooling Water System, Amine-H2S Absorption Plant, Wastewater Stripper Plant, Tempered Water Plant and Caustic Solution Supply System
Aveng Extractive Technologies (Woodmead)
2013
- Literature Study on the flotation of Uranium
- Basic Engineering Package with a +/- 20% cost estimate for a Clarifier Plant for the Areva uranium mine in Namibia
- Study on Ultrafiltration and Reverse Osmosis membrane technology available for the selective separation of uranium containing process streams
SAAB Electronic Defence Systems (Centurion)
2013
- Optimised an 8-step organic synthesis on Laboratory scale and manufactured an organic chemical for SAAB Electronic Defence Systems in one of their applications
Anglo American (Johannesburg)
2011 – 2013
- Research on a pyro-metallurgical process and generation of thermodynamic properties for the Peruke Titanium Project
- Process evaluation of hydrometallurgical processes for the Peruke Titanium Project
- Mass & Energy Balances using the IDEAS Process Simulation Software (Andritz)
Plateau (Pretoria)
2010
- Basic Engineering Package for an Organic Mineral Fertiliser Plant
- Psychrometric model for drying unit
AEL (African Explosives Limited) (Modderfontein)
2009
- Design Package for automation of an explosive plant at AEL Modderfontein
- Detail Piping & Instrumentation Diagrams (P&IDs)
- Hazard & Operability (HAZOP) Study
Foskor (Richards Bay)
2009
- Hydrofluoric Acid (HF) and Aluminium Trifluoride (ATF) Plant Basic Engineering
Alfluorco (Metorex) (Johannesburg)
2009
- Hydrofluoric Acid (HF) and Aluminium Trifluoride (ATF) Plant Basic Engineering: Mass & Energy Balance, plant site layout, civil costing, basic utility plant requirement design and costing, raw material, intermediate product and final product storage requirements, transport logistics
Pebble Bed Modular Reactor (PBMR) (Midrand)
2006 – 2007
- Detail Design of process plant equipment for the Pebble Bed Reactor fuel plant
- Scrubber plant
- Vacuum plant
- Various process pumps: centrifugal, diaphragm, positive displacement
SASOL Nitro (Sasolburg)
2005
- High Pressure Polymer production scale-up to 200 litre scale with variation in raw materials
- High pressure reaction kinetic model
- Agitation optimisation: designed and tested various agitators in high pressure polymer reactor
Endangered Wildlife Trust (EWT) (Johannesburg)
2005
- Launched a self-developed project for the use of a bio-product containing Sodium Fluoro Acetate for Cape Wools and the Woolgrowers Association of South Africa
- Implemented a field trial protocol for evaluation of the bio-product for the Endangered Wildlife Trust (EWT)
Multipole Projects (Centurion)
2004 – 2005
- Developed a process on Laboratory scale, scale-up and production of Hypo Phosphoric Acid on a 50 litre glass-lined reactor, to be used in electroless plating of machine parts
- Built a 50 litre pilot plant and produced biodiesel from used cooking oil
NECSA (Pretoria)
2004
- Developed and built a demonstration plant to recover Ammonium Bifluoride containing 70% Ammonium Bifluoride and 30% Hydrofluoric Acid (HF)
- Potassium Hydroxide (KOH) regeneration plant design, plant costing, economic viability study
Lynn Phillips Consulting (Midrand)
2004
- Feasability Study on the manufacturing of Choline Chloride
BOC (for NECSA) (Pretoria)
2002 – 2004
- Managed the engineering function and resources as well as the engineering change procedures and engineering change proposals (ECPs) (plant modification process)
- Approved Piping & Instrumentation Diagrams (P&IDs) and Process Flow Diagrams (PFDs), execute HAZOP studies and design reviews
- Interviewed and employed engineers for the project team
- Reviewed and approved commissioning plans, compiled operating procedures
- Mass Balances on the Nitrogen Trifluoride (NF3) and associated processes
- Developed a Mass Balance sheet for monthly raw material efficiency calculations on the production plant
- Evaluated and assessed Environmental Impact Assessment (EIA)
- Compiled a comprehensive document pack, assessing engineering and environmental requirements for implementation of plant modifications on the NECSA premises
African Explosives Limited (AEL) (Modderfontein)
2000
- Designed and built a 200 litre glass steam stripping plant and recovered and purified Mono Nitro Resorcinol (MNR)